Non-Emergency Medical Transportation in Greater Chicago
First Class Mobility provides wheelchair, stretcher, and ambulatory transportation across Cook, DuPage, and Lake counties. Every ride starts on time, with a driver who comes to your door and takes the time you need.
- CPR-Certified Drivers
- Live Ride Tracking
- Same-Day Rides
- English, Spanish, Polish & Russian
First Class Is How You’re Treated
To us, first class is the care and respect every person deserves, and you should be able to feel it on the ride. Your driver gets out to greet you by name, helps you at your own pace, and opens the door to a van that is clean every time. It is the little things, done on every ride.
Ambulatory, Wheelchair & Stretcher Rides
Ambulatory
For riders who walk on their own or with a little help. Your driver walks beside you from your door to the van, and again from the van into the building.
Learn More About Ambulatory Rides
Wheelchair
Stay in your own wheelchair for the whole trip. Your driver takes care of boarding, secures the chair before the van moves, and handles every door along the way.
Learn More About Wheelchair Rides
Stretcher
For riders who need to travel lying down, often after surgery or a hospital stay. The move onto the stretcher is gentle, and nobody is hurried.
Learn More About Stretcher RidesNot sure which ride fits? Tell us how your loved one gets around, and we’ll take it from there.
The Four Questions Every Family Asks
Can I Trust You With My Loved One?
First Class Mobility was founded by a nurse with more than 15 years of healthcare experience, and we treat every ride as part of their care. Every driver is background checked, drug screened and certified in CPR and first aid.
Read Our StoryWill You Show Up?
We have seen what a late ride does. The patient is ready, the family is calling around, and the doctor’s office is waiting. Transportation should never be the reason someone misses their care, so being on time is the first thing we owe you.
Will You Keep Me Posted?
Yes. When there is something the family or the facility should know, we call. And you can follow every ride live, from pickup to drop-off.
Will You Treat Them Well?
Every patient is different, and their care should reflect that. Before the ride, we ask what they need, whether that is a steady arm at the curb or help all the way to the room. No one is just another pickup on a driver’s schedule.
Have more questions? Call us and ask.
How to Book a Ride
-
Call or Book Online.
Call 331-313-9917 or fill out the online form. Tell us where the rider is going and how they get around.
-
Get Your Price Up Front.
We confirm the details and give you the price before you book.
-
We Come to the Door.
Your driver arrives at the time we gave you, helps the rider from the door to the van, and walks them inside at the other end.
A Transportation Partner That Arrives Prepared
You know what happens when a ride shows up late or unprepared: the discharge stalls and your phone starts ringing. Tell us what your patient needs, and we’ll be there when we said, ready for it.
See How We Work With FacilitiesServing DuPage, Cook & Lake Counties
We’re based in Wood Dale, where DuPage County meets Cook and O’Hare is a short drive east. From here we reach the western and northwest suburbs, the North Shore, Lake County, and the city of Chicago. Longer trips anywhere in Illinois are welcome too.
- Wood Dale
- Elmhurst
- Schaumburg
- Arlington Heights
- Naperville
- Oak Brook
- Evanston
- Lake Forest
- Chicago
Know Exactly Where Your Loved One Is, From Pickup to Drop-Off
The moment your driver heads out, you’ll get a private tracking link through our Duet platform. Open it on any phone or computer to watch the van’s location update live, from the curb at pickup, through every mile of the route, all the way to the destination. And again on the trip home.
Available on every ride, at no extra cost.
Ready to Book a First Class Ride?
Call us any day from 9 AM to 5 PM, or book online whenever it suits you.
